Phase 6: main zusammenführen #83

Merged
xanibale merged 10 commits from chore/phase6-merge-main into phase/6 2026-10-31 09:09:56 +01:00
Owner

Aufgabe: Vorbereitung Phasenabnahme: main in phase/6 holen, damit der PR nach main konfliktfrei ist.

Änderung:

  • Merge von main (App-Symbol #68). Konflikt in WORKPLAN.md zugunsten der Fassung aus #75 gelöst; T0.15 steht als [x] in docs/workplan-archive.md, Meilensteine neu erzeugt.
  • Test-Fix: ProjectTest öffnete nebenbei den echten SAF-Dialog, weil die Oberfläche auf saveRequest reagierte, während der Test ihn selbst beantwortete. Der Dialog verdeckte MainActivity („No compose hierarchies“, Timeouts; Runs 176, 177). Neu: PlaterStore.saveDialogEnabled (@VisibleForTesting), gesetzt in ProjectTest und ProjectParityFixture.
  • Fix SlicingService: Absturz „startForegroundService() did not then call startForeground()“ in MultipleBedsTest (Run 178, Prozess tot nach 34 von 70 Tests). stopSelf() nach Bett N nahm den schon abgeschickten Start für Bett N+1 mit. Jetzt stopSelfResult(lastStartId), und ein neuer Start beobachtet wieder. Lokal trotz Stresstest consecutiveRunsSurviveServiceStop nicht reproduziert: Ursache aus Log und Code hergeleitet, der Test sichert nur ab.

Tests: ProjectTest auf tablet_api30 vorher 6 von 7 Läufen rot, nachher 8 von 8 grün (9/9). Auf tablet_api30 nach dem Service-Fix: volle Suiten app 70/71, core 112/113 (je 1 übersprungen). tools/check.sh --fast grün. CI-Jobs emulator-smoke, unit-tests, release werden bei Phasen-PRs übersprungen.

🤖 Generated with Claude Code

**Aufgabe:** Vorbereitung Phasenabnahme: `main` in `phase/6` holen, damit der PR nach `main` konfliktfrei ist. **Änderung:** - Merge von `main` (App-Symbol #68). Konflikt in `WORKPLAN.md` zugunsten der Fassung aus #75 gelöst; T0.15 steht als `[x]` in `docs/workplan-archive.md`, Meilensteine neu erzeugt. - Test-Fix: `ProjectTest` öffnete nebenbei den echten SAF-Dialog, weil die Oberfläche auf `saveRequest` reagierte, während der Test ihn selbst beantwortete. Der Dialog verdeckte `MainActivity` („No compose hierarchies“, Timeouts; Runs 176, 177). Neu: `PlaterStore.saveDialogEnabled` (`@VisibleForTesting`), gesetzt in `ProjectTest` und `ProjectParityFixture`. - Fix `SlicingService`: Absturz „startForegroundService() did not then call startForeground()“ in `MultipleBedsTest` (Run 178, Prozess tot nach 34 von 70 Tests). `stopSelf()` nach Bett N nahm den schon abgeschickten Start für Bett N+1 mit. Jetzt `stopSelfResult(lastStartId)`, und ein neuer Start beobachtet wieder. Lokal trotz Stresstest `consecutiveRunsSurviveServiceStop` nicht reproduziert: Ursache aus Log und Code hergeleitet, der Test sichert nur ab. **Tests:** `ProjectTest` auf tablet_api30 vorher 6 von 7 Läufen rot, nachher 8 von 8 grün (9/9). Auf tablet_api30 nach dem Service-Fix: volle Suiten app 70/71, core 112/113 (je 1 übersprungen). `tools/check.sh --fast` grün. CI-Jobs emulator-smoke, unit-tests, release werden bei Phasen-PRs übersprungen. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
Adaptive Icon (Vordergrund, Themen-Symbol, Hintergrundfarbe) aus
docs/assets/app-icon.webp, erzeugt von tools/app-icon.py; Hinweis zum
Android-Roboter (CC BY 3.0, Google) in licenses/.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Meilensteine aktualisieren
All checks were successful
ci / changes (pull_request) Successful in 4s
ci / lint (pull_request) Successful in 3s
ci / release (pull_request) Has been skipped
ci / deps (pull_request) Successful in 24s
ci / emulator-smoke (pull_request) Has been skipped
ci / build (pull_request) Successful in 1m22s
ci / slic3r (pull_request) Successful in 17m45s
ci / unit-tests (pull_request) Has been skipped
93948a13da
Merge remote-tracking branch 'origin/main' into chore/app-icon
Some checks failed
ci / changes (pull_request) Successful in 3s
ci / lint (pull_request) Successful in 3s
ci / release (pull_request) Has been skipped
ci / deps (pull_request) Successful in 28s
ci / emulator-smoke (pull_request) Has been skipped
ci / slic3r (pull_request) Has been cancelled
ci / unit-tests (pull_request) Has been cancelled
ci / build (pull_request) Has been cancelled
73fb4e4707
Merge remote-tracking branch 'origin/main' into chore/app-icon
All checks were successful
ci / changes (pull_request) Successful in 3s
ci / lint (pull_request) Successful in 3s
ci / release (pull_request) Has been skipped
ci / deps (pull_request) Successful in 32s
ci / emulator-smoke (pull_request) Has been skipped
ci / build (pull_request) Successful in 1m52s
ci / slic3r (pull_request) Successful in 18m13s
ci / unit-tests (pull_request) Has been skipped
1161eb8a2f
Merge pull request 'Neues App-Symbol (T0.15)' (#68) from chore/app-icon into main
All checks were successful
ci / changes (push) Successful in 3s
ci / lint (push) Has been skipped
ci / release (push) Successful in 1m18s
ci / deps (push) Has been skipped
ci / emulator-smoke (push) Has been skipped
ci / build (push) Has been skipped
ci / slic3r (push) Has been skipped
ci / unit-tests (push) Has been skipped
d5d288be23
Merge main in phase/6 (T0.15, App-Symbol)
Some checks failed
ci / changes (pull_request) Successful in 4s
ci / lint (pull_request) Successful in 3s
ci / release (pull_request) Has been skipped
ci / deps (pull_request) Successful in 25s
ci / emulator-smoke (pull_request) Has been skipped
ci / build (pull_request) Successful in 1m4s
ci / slic3r (pull_request) Failing after 18m29s
ci / unit-tests (pull_request) Has been skipped
767aec8cf7
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
ci: erneut anstoßen (ProjectTest ohne Compose-Hierarchie, Run 176)
Some checks failed
ci / changes (pull_request) Successful in 3s
ci / lint (pull_request) Successful in 3s
ci / release (pull_request) Has been skipped
ci / deps (pull_request) Successful in 30s
ci / emulator-smoke (pull_request) Has been skipped
ci / build (pull_request) Successful in 39s
ci / slic3r (pull_request) Failing after 17m8s
ci / unit-tests (pull_request) Has been skipped
311200fbea
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
fix(test): ProjectTest ohne echten SAF-Dialog
Some checks failed
ci / changes (pull_request) Successful in 4s
ci / lint (pull_request) Successful in 4s
ci / release (pull_request) Has been skipped
ci / deps (pull_request) Successful in 34s
ci / emulator-smoke (pull_request) Has been skipped
ci / build (pull_request) Successful in 1m23s
ci / slic3r (pull_request) Failing after 17m0s
ci / unit-tests (pull_request) Has been skipped
f530b61b43
Die Oberfläche öffnete auf saveRequest den Speichern-Dialog, obwohl der Test
die Anfrage selbst beantwortet. Der Dialog verdeckte MainActivity.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
fix(slicing): Service-Stopp verliert keinen Start des nächsten Laufs
Some checks failed
ci / changes (pull_request) Successful in 4s
ci / lint (pull_request) Successful in 3s
ci / release (pull_request) Has been skipped
ci / deps (pull_request) Successful in 25s
ci / emulator-smoke (pull_request) Has been skipped
ci / build (pull_request) Successful in 44s
ci / slic3r (pull_request) Failing after 5m33s
ci / unit-tests (pull_request) Has been skipped
910f168a32
stopSelf() nach einem Bett nahm den schon abgeschickten Start des nächsten mit;
startForeground() blieb aus und Android beendete den Prozess. Slice all trifft
das Fenster. Jetzt stopSelfResult mit der letzten Start-ID.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
ci: erneut anstoßen (adb-Hänger beim Emulator-Boot, Run 179)
All checks were successful
ci / changes (pull_request) Successful in 3s
ci / lint (pull_request) Successful in 3s
ci / release (pull_request) Has been skipped
ci / deps (pull_request) Successful in 25s
ci / emulator-smoke (pull_request) Has been skipped
ci / build (pull_request) Successful in 51s
ci / slic3r (pull_request) Successful in 18m46s
ci / unit-tests (pull_request) Has been skipped
5582b3eb49
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
xanibale merged commit 4efcf474bb into phase/6 2026-10-31 09:09:56 +01:00
xanibale deleted branch chore/phase6-merge-main 2026-10-31 09:09:56 +01:00
Sign in to join this conversation.
No reviewers
No labels
feedback
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
xanibale/DroidSlice!83
No description provided.